We are pioneers in foundations and soil technologies
Technical feats and records, innovations, environmental commitments and actions, iconic projects: find out all about the most important dates in Soletanche Bachy’s history.
Discover the events that have marked our history
- 1926
- 1933
- 1929 & 1934
- 1944
- 1952
- 1957
- 1973
- 1988
- 1997
- 2000
- 2009
- 2012
- 2015
- 2017
- 2018
- 2019
- 2019
- 2020
- 2020
- 2021
- 2022
-
The Cheurfas dam (Algeria)
Use of 1,000t prestressed ground anchors to raise the structure
-
Ernest Ischy and Henry Giron buy the SEC company
The company becomes Solétanche in 1948
-
Serre-Ponçon dam (France)
Development of the socket pipe for alluvial soil grouting
-
Marckolsheim hydroelectric power station (France)
The diaphragm wall is used for the first time.
-
Hydrofraise® achieves its first diaphragm wall at Gare de Lyon in Paris (France)
The panels of the cut-off wall pass through blocks of very hard andesite, some of which are over 100 m deep.
-
Mud Mountain Dam (USA)
The panels of the cut-off walls pass through blocks of very hard andesite, some of which are over 100 m deep.
-
Projects Palm Jebel Ali and Palm Jumeirah (Dubai)
135 million m3 of soil are treated by vibroflotation.
-
Soletanche Freyssinet is born
The group includes Soletanche Bachy, Menard, Terre Armée, Freyssinet, Nuvia and now Sixense.
-
West Island Line, métro (Hong Kong)
Implementation of the Tunnel Dismantling Machine (TDM), specially manufactured by Bessac. This is a machine for dismantling an existing tunnel.
-
Design and manufacture of the Hydrofraise® with grippers
A solution for very deep digging in very hard ground (resistance in excess of 100 MPa).
-
Third runway at Hong Kong International Airport:
The world’s largest ever Soil Mixing project.
-
Grand Paris Express (France)
World record for the installation of a CWS® joint at a depth of 74 metres at Vert-de-Maisons station.
-
Launch of Z-Lyze
Z-Lyze is Soletanche Bachy’s platform for collecting, processing and analyzing site data (Big Data).
-
Launch of Soletanche Bachy’s environmental action plan
Because we believe in reasoned, sustainable growth, which involves advancing our foundation and soil technologies’sites and supporting the evolution of our industry by imagining new environmental solutions for projects, we have set up an action plan focused on three objectives
of our industry by imagining new environmental solutions for projects:- Reducing emissions of carbon dioxide produced directly by our activities (diesel, gasoline).
- Reducing emissions linked to the production of electricity purchased by Soletanche Bachy.
- Reducing all indirect emissions (concrete, steel, subcontracting, etc.).
-
Launch of EXEGY by Soletanche Bachy
Exegy by Soletanche Bachy, the low-carbon concrete and grout supply service for foundations.
-
Construction of the world’s first ultra-low-carbon concrete tunnel
Construction of the world’s first tunnel made entirely of EXEGY ultra-low-carbon concrete pipes at Bonneuil-en-France.