Project Description
Context of the project
As part of the strategic EFRA – Effective Refining – Project, designed to maximise the volumes and quality of products obtained from each oil barrel, LOTOS, the oil exploration, production, refining and product distribution group, launched work to extend its refinery.
Description of the project
The Italian KT – Kinetics Technology – group, main contractor in charge of building the coking and hydrogen generation units, awarded the contract to Soletanche Polska to build the 2,500 CFA (Continuous Flight Auger) piles required for both projects.
Our solution
In the space of three months, Soletanche Polska installed 64,418 linear metres of CFA piles, 2,894 units with diameters of 40cm, 60cm, and 80cm.
This performance was praised by the client and the general contractor for the quality of the work, the respect for a very tight schedule, and exemplary safety standards.
Key figures of the project