{"id":20260,"date":"2023-08-30T09:34:05","date_gmt":"2023-08-30T07:34:05","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?post_type=avada_portfolio&p=20260"},"modified":"2023-08-30T09:42:26","modified_gmt":"2023-08-30T07:42:26","slug":"palm-jebel-ali-phase-1-dubai-united-arab-emirates","status":"publish","type":"avada_portfolio","link":"https:\/\/www.soletanche-bachy.com\/en\/offer-portfolio\/palm-jebel-ali-phase-1-dubai-united-arab-emirates\/","title":{"rendered":"Palm Jebel Ali – phase 1, Dubai, United Arab Emirates"},"content":{"rendered":"

Context of the project<\/h2><\/div>

The Palm Jebel Ali<\/a>\u2019 is the second in the series of three \u201cpalm trees\u201d that form an archipelago of artificial islands reclaimed from the sea in Dubai and set out in the shape of a palm tree. This Palm is intended to house residential and tourist complexes<\/a>, shopping and leisure centres, for a population of approximately 250,000 people.<\/p>\n<\/div>

Description of the project<\/h2><\/div>

The Vibroflotation Group Ltd, a former Soletanche Bachy subsidiary, as part of a joint venture with APCC, was awarded the design and build contract for ground improvement<\/a> works.<\/p>\n

The site covers 10km2<\/sup> of land to be treated, spread over a total area measuring 50km2<\/sup>, where most access to the work sites is by sea. This non-standard site mobilized more than 400 people with up to 20 cranes and a series of 36 compaction units (V48 for compacting and V23 for the stone columns).<\/p>\n<\/div>

Our solution<\/h2><\/div>

After backfilling an area contained by rock armour to a thickness of approximately 15m, vibroflotation treatment could commence. This technique, sometimes called vibrocompaction, is used to increase load-bearing capacity, homogenise soil conditions, limit subsidence and differential settlement and eliminate the risk of liquefaction in granular soils. Once this treatment was completed, 60 load-bearing tests, 1,000 test bores and 40,000 CPT (Cone Penetration Tests) were carried out.<\/p>\n

Works performed:<\/strong><\/span><\/p>\n