{"id":20281,"date":"2023-08-30T10:38:41","date_gmt":"2023-08-30T08:38:41","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/offer-portfolio\/musee-de-la-seconde-guerre-mondiale-de-gdansk-pologne\/"},"modified":"2023-08-31T14:52:02","modified_gmt":"2023-08-31T12:52:02","slug":"second-world-war-museum-poland","status":"publish","type":"avada_portfolio","link":"https:\/\/www.soletanche-bachy.com\/en\/offer-portfolio\/second-world-war-museum-poland\/","title":{"rendered":"Second World War Museum, Poland"},"content":{"rendered":"
A Second World War memorial museum is being built in Gda\u0144sk, Poland, where the war began. The ambitious government-funded project provides for a structure that will be almost completely underground.<\/p>\n<\/div>
In seven months, Soletanche Polska excavated the site.\u00a0The bottom of the complex project lies 18 metres below the water table and has a residual water flow rate of 20 cu. Metres per hour across the worksite\u2019s 14,600 sq. metre footprint.<\/p>\n<\/div>
To limit water ingress in the absence of a waterproofing layer, Soletanche Bachy\u2019s Polish subsidiary designed and delivered a temporary anchored diaphragm wall<\/a>. Subsequently, 195,000 cu. metres were dredged under water and a temporary underwater concrete plug was then poured. The plug has a volume of 25,000 cu. Metres (1.5 metres thick, with 914 micropiles to permanently anchor the plug reaching a depth 23 metres). It was poured in seven days without interruption at an average rate of 150 cu. metres per hour.<\/p>\n Respectful of the environment and completed with zero accidents, this project illustrates the expertise of the Soletanche Bachy group.<\/p>\n<\/div>Type of project:<\/h3><\/div>