{"id":10024,"date":"2022-06-20T15:30:46","date_gmt":"2022-06-20T13:30:46","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=10024"},"modified":"2024-05-02T09:11:55","modified_gmt":"2024-05-02T07:11:55","slug":"bessac-completes-the-work-on-the-first-tunnel-built-entirely-with-ultra-low-carbon-concrete-pipes-under-the-exegy-brand","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/bessac-completes-the-work-on-the-first-tunnel-built-entirely-with-ultra-low-carbon-concrete-pipes-under-the-exegy-brand\/","title":{"rendered":"Bessac completes the work on the first tunnel built entirely with Ultra Low Carbon concrete pipes under the EXEGY brand"},"content":{"rendered":"

June 20th, 2022<\/p>\n<\/div>

<\/div>

Bessac completes the work on the first tunnel built entirely with Ultra Low Carbon concrete pipes under the EXEGY brand<\/h1><\/div>
<\/div>

Remember that at the end of 2021 we presented this world-first from Bessac \u2013 a treated water discharge tunnel built using ultra-low-carbon concrete pipes under the brand EXEGY by Bessac. Let\u2019s take a look back at this unprecedented project that has just been completed and demonstrates Soletanche Bachy’s expertise in low carbon concrete.<\/strong><\/p>\n<\/div>

<\/div>