{"id":10270,"date":"2021-12-06T14:35:32","date_gmt":"2021-12-06T13:35:32","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=10270"},"modified":"2022-12-01T14:55:36","modified_gmt":"2022-12-01T13:55:36","slug":"nicholson-returns-to-ohios-project-clean-lake-with-shoreline-storage-tunnel-award","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/nicholson-returns-to-ohios-project-clean-lake-with-shoreline-storage-tunnel-award\/","title":{"rendered":"Nicholson returns to Ohio\u2019s Project Clean Lake with Shoreline Storage Tunnel Award"},"content":{"rendered":"
December 6th, 2021<\/p>\n<\/div>
Project Clean Lake is the Northeast Ohio Regional Sewer District\u2019s (NEORSD) 25-year program designed to reduce the occurrence of combined sewer overflows into Lake Erie and surrounding waterways. Nicholson has previously been part of the Dugway Storage Tunnel and the Westerly Storage Tunnel.<\/strong><\/p>\n<\/div> Nicholson Construction<\/a> was awarded this most recent contract by the McNally Kiewit SST JV. Work includes the construction of three diaphragm wall<\/a> access shafts at three different locations along the tunnel alignment to launch and retrieve the tunnel boring machine for the Shoreline Storage Tunnel.<\/strong> The contract also includes three cement bentonite mass treatment break in\/break out blocks for the tunnel boring machine and two soldier pile reinforced cement bentonite walls to be used as support of excavation systems for two near-surface structures.<\/p>\n<\/div>