{"id":10404,"date":"2021-11-19T16:08:27","date_gmt":"2021-11-19T15:08:27","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=10404"},"modified":"2023-11-14T17:07:25","modified_gmt":"2023-11-14T16:07:25","slug":"soletanche-bachy-paraguay-end-of-a-first-contract-with-numerous-technical-safety-and-environmental-successes","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-paraguay-end-of-a-first-contract-with-numerous-technical-safety-and-environmental-successes\/","title":{"rendered":"Soletanche Bachy Paraguay: end of a first contract with numerous technical, safety and environmental successes"},"content":{"rendered":"
November 19th, 2021<\/p>\n<\/div>
Soletanche Bachy Paraguay finalised the design and build contract on 15 October for the Underground Chambers of the Wastewater Treatment Plant (PTAR) at Bella Vista \u2013 Asunci\u00f3n (Paraguay).<\/strong><\/p>\n<\/div> The chambers are part of the Treatment Plant being built by ACCIONA AGUA for the Ministry of Public Works and Communications of Paraguay (MOPC), financed by the Inter-American Development Bank.<\/p>\n The project consists in constructing the two deep chambers of the purification plant: the \u201ccoarse screening chamber\u201d and the \u201cpumping chamber\u201d. The total internal area is 400m2, and the maximum depth of the excavation is 17m. The PTAR is being built in an area of sandy made-up ground on the banks of the River Paraguay.<\/p>\nThis whole project is a great step forward from the technical-commercial, safety and environmental points of view.<\/h4>\n<\/div>