{"id":10764,"date":"2021-08-04T10:04:27","date_gmt":"2021-08-04T08:04:27","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=10764"},"modified":"2022-12-08T10:38:03","modified_gmt":"2022-12-08T09:38:03","slug":"sncf-le-rondeau-interchange-the-first-grabs-have-unloaded-at-the-dreal-worksite-at-le-rondeau-grenoble","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/sncf-le-rondeau-interchange-the-first-grabs-have-unloaded-at-the-dreal-worksite-at-le-rondeau-grenoble\/","title":{"rendered":"SNCF \u2013 Le Rondeau interchange: the first grabs have unloaded at the DREAL worksite at Le Rondeau, Grenoble"},"content":{"rendered":"

August 4th, 2021<\/p>\n<\/div>

<\/div>

SNCF \u2013 Le Rondeau interchange: the first grabs have unloaded at the DREAL worksite at Le Rondeau, Grenoble<\/h1><\/div>
<\/div>

After the DREAL worksite awarded to the consortium made up of Campenon Bernard Center-Est\/Soletanche Bachy France<\/a> \/Soletanche Bachy Fondations Sp\u00e9ciales<\/a> \/VINCI Construction Terrassement\/Sogea\/Eurovia<\/a> \u2013 involving development of the interchange which will expand part of Grenoble’s southern bypass, the RN87, from two to three lanes in each direction \u2013 another site, located a few meters away, has just been acquired on behalf of SNCF.<\/strong><\/p>\n<\/div>

<\/div>

SNCF selected the bid from the Campenon Bernard Center Est\/Soletanche Bachy\/VINCI Construction Terrassement<\/a>\u00a0consortium for the construction of two rail bridges to allow the future RN87 road links to pass beneath the railway line.<\/p>\n

For the teams, this is a complex site with numerous challenges:<\/p>\n