{"id":11241,"date":"2021-07-26T14:17:14","date_gmt":"2021-07-26T12:17:14","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=11241"},"modified":"2022-12-13T14:50:17","modified_gmt":"2022-12-13T13:50:17","slug":"live-the-experience-by-nicholson-construction-the-merchants-bridge-project-in-saint-louis-missouri","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/live-the-experience-by-nicholson-construction-the-merchants-bridge-project-in-saint-louis-missouri\/","title":{"rendered":"Live the experience by Nicholson Construction: the Merchants Bridge Project in Saint Louis, Missouri"},"content":{"rendered":"

July 26th, 2021<\/p>\n<\/div>

<\/div>

Live the experience by Nicholson Construction: the Merchants Bridge Project in Saint Louis, Missouri<\/h1><\/div>
<\/div>
\n
\n
\n
\n

Merchants Bridge is a historic through-truss railroad bridge that crosses the Mississippi River north of St. Louis, Missouri. The bridge is the sixth busiest freight train crossing of the Mississippi River and hosts approximately 32 trains per day. The combination of the bridge’s location within the New Madrid fault system and the increased weight of rail traffic made the case for a repair project, which included expanding and encasing the existing piers, replacing the exiting truss spans and expanding and encasing the approach spans.<\/strong><\/p>\n<\/div>\n<\/div>\n

\n
\n
\u00a0<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>
<\/div>

Nicholson<\/a> was contracted by Walsh Construction to perform micropile<\/a> installation as part of a rehabilitation project to upgrade the existing pier capacities. This required our team to work from land as well as on water. The work began in February 2020 and was completed in June 2021.<\/p>\n

The project is on track for completion by early 2023.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>
<\/span><\/div><\/div><\/div>
<\/div><\/div><\/div>

For more information…<\/p>\n

\u00a0<\/p><\/h3><\/div>

<\/div>
<\/div><\/div>
<\/div>

Let\u2019s Drilldown into Merchant\u2019s Bridge!<\/strong><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/i>Open the infographic<\/span><\/a><\/div>
<\/div><\/div><\/div><\/div><\/div>
<\/i>Find out more about Nicholson Construction<\/span><\/a><\/div>
<\/div>
<\/i>Find out more about our micropile process<\/span><\/a><\/div><\/div><\/div>
<\/div><\/div><\/div><\/div>

Share the news<\/p>\n

\u00a0<\/p>\n

\u00a0<\/p><\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France a \u00e9t\u00e9 mandat\u00e9 pour construire un bassin de stockage \u00e0 Nantes<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Australia: Rob Carr carries out construction work on the Eleventh Road sewer collector in Armadale<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE: Bachy Balineau Antilles Guyane is involved in the renovation of the port of Jarry, in Guadeloupe!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring carries out reinforcement work on the CA04S road in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bachy Soletanche Singapore: Progress on the Construction of Riviera Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bratislava Smart City Office: Soletanche Bachy Slovensko, HBM and Soletanche Ceska Republika Collaborate!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

New Zealand: March completes work on the Opal Drive Pump Station Project<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France: The Livernan Tunnel project is nearing completion after a year of work!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio Swissboring Reconstructs the Titihuapa Bridge in El Salvador<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska Returns for a Second Contract: The Tramway Tunnel Under Warsaw Station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France contributes to the modernization and securing of the Nice-Breil railway line!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy strengthens its presence in the United States with the acquisition of Hub Foundation<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France builds the diaphragm walls of the future car park at Lausanne station<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Nicholson Construction: Focus on the Clean Lake project in GeoStrata<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Rodio SwissBoring: Construction of its first LEED-certified building in Panama<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Polska advances on the Skyliner II<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

ForSHORE by CIMESA : Design – Construction of a quay in Veracruz<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Monaco Bel Air: Completion of Works by Soletanche SAM and Soletanche Bachy France Teams!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

GFWA improves the road network around Perth<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

First GRP pipe installation project for Bessac Andina<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":1006,"featured_media":11285,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[461,464],"tags":[],"class_list":["post-11241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-news-project"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/11241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/users\/1006"}],"replies":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/comments?post=11241"}],"version-history":[{"count":0,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/11241\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media\/11285"}],"wp:attachment":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media?parent=11241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/categories?post=11241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/tags?post=11241"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}