{"id":12276,"date":"2021-04-28T12:08:10","date_gmt":"2021-04-28T10:08:10","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=12276"},"modified":"2023-01-05T12:15:28","modified_gmt":"2023-01-05T11:15:28","slug":"world-day-for-safety-at-work-for-soletanche-bachy-safety-is-about-teamwork","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/world-day-for-safety-at-work-for-soletanche-bachy-safety-is-about-teamwork\/","title":{"rendered":"World Day for Safety at Work \u2013 for Soletanche Bachy, safety is about teamwork"},"content":{"rendered":"

April 28th, 2021<\/p>\n<\/div>

<\/div>

World Day for Safety at Work \u2013 for Soletanche Bachy, safety is about teamwork<\/h1><\/div>
<\/div>

At Soletanche Bachy, safety<\/a> is central to our foundation<\/a> and soil technology projects, from the call for bids to execution of the worksite. Our safety culture has developed over the years and shown us the importance of teamwork on a daily basis and at every stage of a project. To mark World Day for Safety at Work, learn about the actions implemented by and for our teams on our worksites.<\/strong><\/p>\n<\/div>

<\/div>

Safety in teams: practical measures taken by Soletanche Bachy<\/h2><\/div>

Worksite preparation stage:<\/strong><\/p>\n

Regardless of the foundation process or soil technology used (diaphragm wall, piles, jet grouting, injection, ground anchors, etc.), a risk analysis is carried out within the team. This ensures that the worksite is planned with the highest level of safety.<\/p>\n

During execution of the worksite:<\/strong><\/p>\n

A Pre-Start meeting is held each day. This is an opportunity for discussions about how risks are perceived within a team.<\/p>\n

Many Soletanche Bachy operations require the cooperation of several people on the worksite, such as lifting operations which involve significant teamwork. Roles, responsibilities and communication are key elements to ensure the safety of those operations:<\/p>\n