{"id":12970,"date":"2021-05-10T09:09:19","date_gmt":"2021-05-10T07:09:19","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=12970"},"modified":"2023-01-17T09:22:45","modified_gmt":"2023-01-17T08:22:45","slug":"nicholson-returns-to-portage-lakes-in-ohio-for-north-reservoir-dam-project","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/nicholson-returns-to-portage-lakes-in-ohio-for-north-reservoir-dam-project\/","title":{"rendered":"Nicholson returns to Portage Lakes in Ohio for North Reservoir Dam Project"},"content":{"rendered":"
May 10th, 2021<\/p>\n<\/div>
The 100-year-old North Reservoir dam will undergo a $22.9M (approximately $18.9M) repair project to bring it into compliance with Ohio Dam Safety\u2019s standards.<\/strong><\/p>\n<\/div> The last remediation project on North Reservoir Dam was performed in 1982. The current remediation project includes seepage cutoff, overtopping protection and replacement of the existing spillway and lake drain.<\/strong><\/p>\n Nicholson was contracted by Beaver Excavating Company to construct a soil-mix<\/a> gravity section and cutoff wall<\/a><\/strong> for the new dam in order to mitigate excessive seepage and to increase its factor of safety.<\/p>\n