- <\/a><\/li><\/ul><\/div>florianpaolacci<\/a><\/span><\/span>2024-11-25T16:51:28+01:00<\/span>
Monaco Bel Air: Completion of Works by Soletanche SAM and Soletanche Bachy France Teams!<\/a><\/h4>
{"id":13537,"date":"2021-01-19T17:58:21","date_gmt":"2021-01-19T16:58:21","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=13537"},"modified":"2023-04-04T19:06:49","modified_gmt":"2023-04-04T17:06:49","slug":"rodio-swissboring-el-savador-wins-one-of-the-most-important-contracts-of-its-history","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/rodio-swissboring-el-savador-wins-one-of-the-most-important-contracts-of-its-history\/","title":{"rendered":"Rodio Swissboring El Savador wins one of the most important contracts of its history"},"content":{"rendered":"
January 19th, 2021<\/p>\n<\/div>
Rodio Swissboring El Salvador has been selected to carry out specialist works to finish the El Chaparral hydro-electric project in north-eastern of El Salvador.<\/strong><\/p>\n<\/div>\n<\/div>\n Commissioned by the government of El Salvador through the Hydro-Electric Commission of the Lempa River, the project includes the construction of the grout curtain, drainage system and dam instrumentation in conjunction with Rodio Kronsa<\/a> with support from Sixense<\/a>. Also, the project calls for the construction of a rockfill dyke and a plastic concrete diaphragm wall on the right abutment of the dam<\/a>, as well as waterproofing and additional works in the project\u2019s loading chamber, which will be done with the support of Carpi.<\/p>\n<\/div> The contract signed at the end of December 2020 with a completion time of 245 days is the largest contract in the recent history of the company.<\/p>\n<\/div>\n<\/div>\n\n\n\u00a0<\/div>\n<\/div>\n<\/div>\n<\/div><\/div>\n\n