- <\/a><\/li><\/ul><\/div>florianpaolacci<\/a><\/span><\/span>2024-11-25T16:51:28+01:00<\/span>
Monaco Bel Air: Completion of Works by Soletanche SAM and Soletanche Bachy France Teams!<\/a><\/h4>
{"id":16412,"date":"2017-02-02T10:21:08","date_gmt":"2017-02-02T09:21:08","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=16412"},"modified":"2023-03-29T10:28:35","modified_gmt":"2023-03-29T08:28:35","slug":"bouygues-and-soletanche-bachy-appointed-for-the-grand-paris-express-t2a-project","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/bouygues-and-soletanche-bachy-appointed-for-the-grand-paris-express-t2a-project\/","title":{"rendered":"Bouygues and Soletanche Bachy appointed for the Grand Paris Express (T2A) project"},"content":{"rendered":"
02\/02\/2017<\/p>\n<\/div>
The civil engineering works for section T2A between Villejuif Louis-Aragon and Cr\u00e9teil l’Echat stations will be carried out by the consortium of Soletanche Bachy France, Soletanche Bachy Tunnels, Bessac and SADE, led jointly by Bouygues Travaux Publics.<\/strong><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div> Soci\u00e9t\u00e9 du Grand Paris<\/a> has appointed the consortium led by Bouygues TP for the section of the Grand Paris Express between Villejuif and Cr\u00e9teil.<\/p>\n 2017 marked the launch of civil engineering works along the full route of Grand Paris Express Line 15 South.<\/p>\n Soci\u00e9t\u00e9 du Grand Paris has just awarded the fourth of the line\u2019s eight civil engineering<\/a> contracts, worth \u20ac968 million (\u20ac807 million + VAT), to a consortium led by Bouygues TP.<\/p>\n The civil engineering works for section T2A between Villejuif Louis-Aragon and Cr\u00e9teil l\u2019Echat stations will be carried out by the consortium of Soletanche Bachy France<\/a>, Soletanche Bachy Tunnels<\/a>, Bessac <\/a>and SADE, led jointly by Bouygues Travaux Publics.<\/p>\n The main contribution from Soletanche Bachy will be its expertise in special foundations<\/a>.<\/p>\n [\u2026] Bouygues Travaux Publics and the Soletanche Bachy group companies are already working together on other urban projects, including the ongoing project to extend Line 14 northwards between the Saint-Lazare stations and Saint-Ouen Town Hall. <\/p>\n<\/div>[PRESS RELEASE IN FRENCH]<\/h2><\/div>
<\/span><\/div><\/div><\/div><\/div>