{"id":17422,"date":"2023-01-20T12:41:52","date_gmt":"2023-01-20T11:41:52","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/paris-2024-soletanche-bachy-france-et-bessac-ameliorent-la-qualite-de-leau-de-la-marne-pour-les-epreuves-de-natation\/"},"modified":"2023-11-13T18:36:55","modified_gmt":"2023-11-13T17:36:55","slug":"paris-2024-soletanche-bachy-france-and-bessac-improve-water-quality-in-the-marne-for-swimming-events","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/paris-2024-soletanche-bachy-france-and-bessac-improve-water-quality-in-the-marne-for-swimming-events\/","title":{"rendered":"Paris 2024: Soletanche Bachy France and Bessac improve water quality in the Marne for swimming events"},"content":{"rendered":"
20\/01\/2023<\/p>\n<\/div>
Soletanche Bachy France<\/a> and Bessac<\/a>, in a consortium with Valentin TP<\/a> (lead contractor) and Bessac, has been appointed by SIAAP (the Paris Agglomeration Interdepartmental Sanitation Association) to connect two structures in the Parisian sanitation network: the XI structure in Neuilly-sur-Marne and the RGM collector in Noisy-le-Grand.<\/p>\n<\/div> Through this project, Soletanche Bachy is helping to build infrastructure that preserves the environment by improving water quality: the XI structure project is part of the Marne and Seine sanitation programme to make those swimmable for events at the Paris 2024 Olympic and Paralympic Games. This programme, being carried out in Neuilly-sur-Marne and Noisy-le-Grand, particularly includes the creation of a depressed sewer structure and a tunnel under the Marne using a microtunnelling machine, which will eventually transport effluents between the XI structure and the RGM collector, thereby reducing discharges into the Marne.<\/p>\n For Soletanche Bachy, this involves building three structures, linked by two microtunnel sections 236m and 307m long (DN1200), in a dense urban environment:<\/p>\n Various injection, jet-grouting and micropiling works are also planned for the ancillary structures. Work will begin in November 2022 and last around a year.<\/p>\n<\/div>\n<\/div>\n<\/div>\n
\n
\n