{"id":17847,"date":"2022-11-25T16:24:45","date_gmt":"2022-11-25T15:24:45","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/hongrie-hbm-smart-demontre-que-lagilite-est-un-atout-dans-le-domaine-du-genie-civil\/"},"modified":"2023-11-13T18:58:29","modified_gmt":"2023-11-13T17:58:29","slug":"hungary-hbm-smart-proving-agile-operations-to-be-successful-in-civil-engineering","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/hungary-hbm-smart-proving-agile-operations-to-be-successful-in-civil-engineering\/","title":{"rendered":"Hungary: HBM SMART proving agile operation to be successful in civil engineering"},"content":{"rendered":"

25\/11\/2022<\/p>\n<\/div>

<\/div>

Hungary: HBM SMART proving agile operation to be successful in civil engineering<\/h1><\/div>
<\/div>

In 2019, HBM<\/a>, Soletanche Bachy\u2019s subsidiary in Hungary, created its so-called SMART business unit (Small Agile Rapid Team) to carry out smaller-scale foundations works often with short, two- to three-day deadlines. Since then, the unit, specializing in pile foundation, mini and micropile drilling, has served more than 20 customers and recently added new projects to its portfolio.<\/strong><\/p>\n<\/div>

<\/div>

In 2021, SMART built the foundations<\/a> of a hydrogen and carbon monoxide production plant in Eastern Hungary. The client has requested SMART\u2019s services for the third time, now to execute CFA piling on the area of its operating chemical plant. Quality and occupational safety expectations are very high in such work areas. In such a highly regulated environment, the professional challenge was to meet all the needs of the customer. SMART\u2019s agile and close-in-contact operation allows the unit to meet these needs more easily.<\/p>\n

Last year, SMART worked for yet another returning client on a public ice hall building in the Southern part of the country. The team delivered a weeklong screwsol work with continuous variation management, making the client \u2013 contractor relation more stable. The project proved that holding planning, implementation, and follow-up in one hand allows SMART to have a be more efficient and faster information flow and decision-making than in a multi-player system and furthers trust in client relations.<\/p>\n<\/div>

SMART projects for 2022<\/h2><\/div>

In 2022 HBM SMART has built the foundations of four projects so far in the field of hotels, industrial and agriculture.<\/p>\n

For a hotel construction by the lake Balaton, the SMART team cooperated with a foreign client and delivered CFA foundation works on artificial embankment. Furthermore, they executed jetgrouting piles in the basement of a monument building in the downtown of Budapest, where strict sinking criteria were imposed. In addition to higher efficiency, machinery adapted to special needs (for example, working inside a building) appear as added value at SMART.<\/p>\n

The unit also had the chance to work with two returning clients this year, in the industrial and agricultural sectors. SMART has cooperated with one of the world\u2019s leading independent development companies of the vehicle industry and developed the foundations of their test and office buildings with Screwsol technology. HBM has executed the first phase piling 2 years ago for the same customer.<\/p>\n

Based on HBM\u2019s previous fruitful cooperation with another client from already 15 years ago, the SMART branch won the project of foundation works of a grain silo park, where they deliver rigid inclusion with long screwsol piles. SMART will build 8 grain silos for which they will be able to utilize the data collected during the works carried out in the same field over a decade ago.<\/p>\n

Providing an outlook for the rest of the year, Di\u00e1na Lisk\u00e1ny, head of HBM\u2019s SMART department emphasized that they aim to continue to serve developers and general contractors \u2013focused mainly on Screwsol and CFA piling-, who doesn\u2019t want to compromise on quality, cost- and time-efficiency and the use of state-of-the-art, sustainable technologies (such as the usage of piling methods with no excavated soil or ultra-low carbon concrete) with the same commitment as they\u2019ve been doing from the very beginning. In the meantime, they are investigating the possibility of adapting the SMART operation model to HBM\u2019s Debrecen BU, thus to the Eastern Hungarian market as well.<\/p>\n<\/div>

How does SMART work?<\/h2><\/div>

The essence of SMART is that planning, implementation, and follow-up are held in one hand, making information flow and decision-making more efficient and faster than in a multi-player system. This allows HBM to flexibly tailor its high-quality service to the customer\u2019s individual needs while working more closely with the customer. In addition to increased efficiency, reducing costs and construction time are the benefits SMART delivers.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>

Share the news<\/h3><\/div>

<\/a><\/a><\/a><\/a><\/a><\/a><\/div><\/div> <\/p>\n<\/div><\/div><\/div>
<\/div><\/div>
<\/div><\/div><\/div><\/div><\/div>

Recent news<\/p>\n

<\/h2><\/div><\/div><\/div>

<\/i>All the news<\/span><\/a><\/div><\/div><\/div>
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Monaco Bel Air: Completion of Works by Soletanche SAM and Soletanche Bachy France Teams!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

GFWA improves the road network around Perth<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

First GRP pipe installation project for Bessac Andina<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Nicholson Construction rehabilitates the Red Bluff dam ( Texas)<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soil Engineering conducts ground studies on a subsidence of the M80 highway in Scotland!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Upper One: Foundation Work Completed for the Skyscraper by Soletanche Polska!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Romania: the first institute dedicated to artificial intelligence research is under construction<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France: An 18,000 m\u00b3 water retention basin in Clichy-sous-Bois.<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Nicholson Construction and SBI Major Projects improve New York’s water quality<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

In Belgium, Fontec wins lot 3A of the Oosterweel road project in Anvers.<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Poland: the foundations of the Otwock Training Center are ready!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Strong Soletanche Bachy presence at ECSMGE 24 conference in Lisbon<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Roger Bullivant uses EXEGY\u00ae very low carbon concrete for CHD piles in Orbiston<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Another milestone reached on the NSC 105 project: completion of the cast tunnel wall<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bachy Soletanche builds the foundations for Riverside 2<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy to contribute, as part of the IRIS consortium, in the design and build of Line 15 East of the Grand Paris Express from Bobigny to Saint-Ouen!<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy Romania builds deep foundations for a sport hall<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Hong Kong: What’s the status of Central Harbourfront ?<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Soletanche Bachy France donates pumps to NGO Ummanit\u00e9 for access to drinking water in Mali<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n
<\/span><\/a><\/span>
\n\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\"\"\t\t\t<\/a>\n\t\t\t\t\t\t\t<\/div>\n<\/div>
<\/div>

Bessac rewarded: the 1st EXEGY ultra-low-carbon microtunnel<\/a><\/h3><\/div>
<\/div><\/div><\/div>\n<\/div>
<\/i><\/div>
<\/i><\/div><\/div><\/div><\/div>
<\/i>All the news<\/span><\/a><\/div><\/div><\/div><\/div><\/div>\n
<\/div>\n<\/div><\/div><\/div><\/div>\n
<\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"

Zetta-Lyze is a multi-application, multi-profile\/profession, multi-source database platform, easily accessible from anywhere, that provides production information in real time. <\/p>\n","protected":false},"author":1006,"featured_media":17844,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[461],"tags":[],"class_list":["post-17847","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/17847","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/users\/1006"}],"replies":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/comments?post=17847"}],"version-history":[{"count":1,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/17847\/revisions"}],"predecessor-version":[{"id":25605,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/posts\/17847\/revisions\/25605"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media\/17844"}],"wp:attachment":[{"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/media?parent=17847"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/categories?post=17847"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.soletanche-bachy.com\/en\/wp-json\/wp\/v2\/tags?post=17847"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}