{"id":26643,"date":"2024-01-30T16:15:26","date_gmt":"2024-01-30T15:15:26","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/nicholson-construction-participe-a-la-construction-rehabilitation-de-la-nouvelle-ecluse-de-sault-michigan\/"},"modified":"2024-04-18T17:31:50","modified_gmt":"2024-04-18T15:31:50","slug":"nicholson-construction-is-involved-in-the-construction-rehabilitation-of-the-new-lock-at-the-soo-in-michigan","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/nicholson-construction-is-involved-in-the-construction-rehabilitation-of-the-new-lock-at-the-soo-in-michigan\/","title":{"rendered":"Nicholson Construction is involved in the construction\/rehabilitation of the new Lock at the Soo in Michigan."},"content":{"rendered":"

30\/01\/2024<\/p>\n<\/div>

<\/div>

Nicholson Construction is involved in the construction\/rehabilitation of the new Lock at the Soo in Michigan.<\/h1><\/div>
<\/div>

Every year, almost 10,000 freight boats pass through the 3 locks at the Soo. These infrastructures are over 100 years old, so regular maintenance is essential to keep traffic moving. With this in mind, Nicholson was commissioned to rebuild and extend one of the locks.<\/p>\n<\/div>

<\/div>

In 2019, the U.S. Army Corps of Engineers is launching the construction of a new lock at the Soo, on the St. Marys River in Michigan. It is from this access point that over 10,000 freighters transit, carrying more than 86 million tonnes of cargo across the Great Lakes every year. \u00a0<\/p>\n

The rehabilitation project is divided into 3 different phases:<\/p>\n