{"id":28416,"date":"2024-09-13T16:10:05","date_gmt":"2024-09-13T14:10:05","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=28416"},"modified":"2024-09-13T16:10:05","modified_gmt":"2024-09-13T14:10:05","slug":"poland-the-foundations-of-the-otwock-training-center-are-ready","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/poland-the-foundations-of-the-otwock-training-center-are-ready\/","title":{"rendered":"Poland: the foundations of the Otwock Training Center are ready!"},"content":{"rendered":"

13\/09\/2024<\/p>\n<\/div>

<\/div>

Poland: the foundations of the Otwock Training Center are ready!<\/h1><\/div>
<\/div>

General contractor Warbud has awarded Soletanche Polska the contract to build the foundations for the new training center at the Professor Adam Gruca CMKP Hospital in Otwock. The center will be the first in Poland dedicated to training surgeons, and will be equipped with the most advanced technologies.<\/strong><\/p>\n

\u00a0<\/strong><\/p>\n<\/div>

The Oosterweel project involves the construction of a road interchange between the E17 and E34 freeways, which will also complete the ring road around the city of Antwerp. The OWK tunnel is the third lot of the project. Owner Lantis represents the Flemish region, and our subsidiary Fontec is acting as subcontractor for the Rinkoni\u00ean consortium (Artes \/ Mobilis TBI \/ Boskalis \/ CIT Blaton \/ Stadsbader).<\/p>\n

Work began in August 2024 and will last approximately two and a half years.<\/p>\n<\/div>

<\/div><\/div><\/div>
<\/div>\n\n<\/div>
<\/div><\/div><\/div>\n<\/div><\/div>

O<\/strong>ur mission<\/strong><\/h2><\/div>

Soletanche Polska carried out advanced foundation work on this project, including the execution of deep foundations and the installation of support systems.<\/p>\n

The site included :<\/p>\n