{"id":29669,"date":"2025-01-16T11:08:34","date_gmt":"2025-01-16T10:08:34","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/soletanche-bachy-france-realise-les-parois-moulees-du-futur-parking-de-la-gare-de-lausanne\/"},"modified":"2025-01-16T15:19:12","modified_gmt":"2025-01-16T14:19:12","slug":"soletanche-bachy-france-builds-the-diaphragm-walls-of-the-future-car-park-at-lausanne-station","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-france-builds-the-diaphragm-walls-of-the-future-car-park-at-lausanne-station\/","title":{"rendered":"Soletanche Bachy France builds the diaphragm walls of the future car park at Lausanne station"},"content":{"rendered":"
16\/01\/2025<\/p>\n<\/div>
Soletanche Bachy France has been commissioned to build the foundations for the future station car park, with the aim of enlarging Lausanne station.<\/strong><\/p>\n<\/div> The L\u00e9man 2030 project led by the Swiss Federal Railways (CFF) aims to improve the flow of rail traffic between the cities of Lausanne and Geneva, in particular by expanding Lausanne station. As part of this major project, a 9-storey structure with 4 basement levels is due to be built in 2026. Built under the direction of CSD Ing\u00e9nieurs, it will house the future Les Epinettes car park, as well as premises, shops and a new 400m-long platform for trains on the roof of the building (a first in Switzerland).<\/p>\n<\/div> <\/p>\n Focus on the construction site<\/strong><\/p>\n \u00a0<\/strong><\/p>\n <\/p><\/h2><\/div> The teams from Soletanche Bachy France, subcontracted by the general contractor Grisoni, are working on the construction of the diaphragm walls for the future parking facility.<\/p>\n This project is particularly complex:<\/p>\n Work began in September 2023 from the upper embankment, where our subsidiary\u2019s teams had to deal with the confined nature of the work area. The work is being carried out close to live railway tracks, on a 12-meter-wide platform. This platform accommodates heavy equipment, including a cable bucket, an electric HC05 Hydrofraise\u00ae, and a 220-ton handling crane.<\/p>\n<\/div>\n