{"id":30145,"date":"2025-02-03T16:15:10","date_gmt":"2025-02-03T15:15:10","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/soletanche-bachy-france-participe-a-la-modernisation-et-la-securisation-de-la-ligne-ferroviaire-nice-breil\/"},"modified":"2025-02-03T16:35:12","modified_gmt":"2025-02-03T15:35:12","slug":"soletanche-bachy-france-contributes-to-the-modernization-and-securing-of-the-nice-breil-railway-line","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/soletanche-bachy-france-contributes-to-the-modernization-and-securing-of-the-nice-breil-railway-line\/","title":{"rendered":"Soletanche Bachy France contributes to the modernization and securing of the Nice-Breil railway line!"},"content":{"rendered":"

03\/02\/2025<\/p>\n<\/div>

<\/div>
<\/div>

Soletanche Bachy France contributes to the modernization and securing of the Nice-Breil railway line!<\/h1><\/div>
<\/div>

Since mid-September 2024, SNCF R\u00e9seau has mandated the consortium of Colas Rail, Soletanche Bachy France, La Nouvelle Sirolaise de Construction, CAN, and Hydrokarst to carry out modernization works on the tracks, reinforcement of engineering structures, and strengthening of tunnels. The objective is to improve mobility in the region of the Nice-Breil railway line.<\/p>\n<\/div>

<\/div>

As part of the State-Region Plan Contract (CPER), the section of the line between Drap and Breil-sur-Roya will undergo a major regeneration and securing program. The plan includes the consolidation and stabilization of existing engineering structures along the route.<\/p>\n<\/div>

Works planned for 2024 and 2025<\/h2><\/div>

Between 2024 and 2025, the line will be completely closed to carry out the following works:<\/p>\n