{"id":6451,"date":"2022-06-07T15:39:59","date_gmt":"2022-06-07T13:39:59","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/monaco-testimonio-ii-clap-de-fin-pour-ce-chantier-phare-de-fondations-pour-soletanche-bachy\/"},"modified":"2023-11-14T17:44:03","modified_gmt":"2023-11-14T16:44:03","slug":"monaco-testimonio-ii-end-of-flagship-soletanche-bachy-foundations-worksite","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/monaco-testimonio-ii-end-of-flagship-soletanche-bachy-foundations-worksite\/","title":{"rendered":"Monaco Testimonio II \u2013 End of this flagship Soletanche Bachy foundations worksite"},"content":{"rendered":"
June 7th, 2022<\/p>\n<\/div>
To mark the end of the works for the Soletanche Bachy teams, let\u2019s take a look back at the Testimonio II project in Monaco \u2013 a deep foundation project, exceptional in terms of its duration, its technicality and its commitments to reducing the environmental impact of worksite.<\/strong><\/p>\n<\/div> Six years after work began, the worksite teams completed the final critical operation: releasing the temporary anchors<\/a> of the 35m-high retaining structure located under the Villa Florida, while ensuring transfer of the earth pressure to the self-stabilising structure built in front. This loading of the building was done by horizontal jacking of the floors to compensate for the structure\u2019s specific deformations in order to reduce settlement under the villa.<\/p>\n At the end of the operation, the structure\u2019s deformations proved to be in line with estimates and settlement under the villa was no more than 2mm (making a total of approximately 2cm since the start of the works).<\/p>\n This last step marks the end of the works for Soletanche Bachy.<\/p>\n<\/div>Release of the temporary anchors \u2013 a final step successfully completed<\/h2><\/div>