{"id":7890,"date":"2022-09-05T15:24:28","date_gmt":"2022-09-05T13:24:28","guid":{"rendered":"https:\/\/www.soletanche-bachy.com\/?p=7890"},"modified":"2022-11-04T10:44:22","modified_gmt":"2022-11-04T09:44:22","slug":"micropiling-works-on-the-pont-de-pierre-bridge-in-bordeaux","status":"publish","type":"post","link":"https:\/\/www.soletanche-bachy.com\/en\/micropiling-works-on-the-pont-de-pierre-bridge-in-bordeaux\/","title":{"rendered":"Micropiling works on the Pont de Pierre bridge in Bordeaux"},"content":{"rendered":"
September 5th, 2022<\/p>\n<\/div>
Nearly 20 years after a project to reinforce the bridges first piers, Soletanche Bachy France (the consortium\u2019s lead contractor with Sixense<\/a> Monitoring) was awarded the micropile test framework contract by Bordeaux M\u00e9tropole and its engineer BG Ing\u00e9nierie.<\/strong><\/p>\n<\/div> The purpose of this test (framework contract renewable once) is to prepare future for underpinning work<\/a> on piers P7 to P16 using micropiles, scheduled for 2024.<\/span>\u00a0<\/span><\/p>\n This will involve conducting two types of tests:<\/span>\u00a0<\/span><\/p>\n\n